top of page
Search

Retail, Café and Restaurant Fit-Out in Beirut: Opening on the Date You Promised

Jadded
Sep 1, 2024
2 min read

Updated: Oct 15

A home renovation can slip a week and the family copes. A café cannot. Behind every commercial fit-out in Beirut there is a date that does not move: the lease has started, the staff are hired, the opening has been announced. Jadded plans the whole project backwards from that date.

What a retail or F&B fit-out involves

A shell unit in a Beirut building usually arrives as bare walls, a concrete floor and a single power point. Turning it into a working café, shop or restaurant means a sequence of trades that have to land in the right order:

  • Space planning and interior design around how customers and staff actually move

  • Civil works, waterproofing and floor levelling, especially for kitchens and wet areas

  • Electrical, lighting, data and AC coordination sized for equipment and peak hours

  • Plumbing, drainage and extraction routes for F&B kitchens and bars

  • Gypsum and glass partitions, ceilings and acoustic treatment

  • Flooring that survives traffic: porcelain, SPC, polished concrete or timber

  • Bespoke joinery: counters, bars, display walls, shelving and seating

  • Shopfront, signage walls, painting and final finishes

Why the opening date drives everything

Most delays in commercial fit-outs come from two things: materials ordered too late, and trades arriving in the wrong order. Jadded builds the programme from the opening date back: long-lead items such as countertops, glass, custom joinery and equipment are ordered first, and the site sequence is set so that no trade waits on another. The programme is shared with you before signing, and progress is reported against it.

Working inside a live building

Shops and cafés usually sit in occupied buildings or malls. We coordinate access and working hours with building management, protect common areas, schedule noisy and dusty works out of hours where needed, and handle the approvals the building requires. Where part of a space must stay open, we phase the work.

One contract, one price, one team

Jadded is a design and build contractor. We design the space or execute your designer's drawings, price every item in a bill of quantities, and build it with our own project manager running the site. Changes during the project are issued as written change orders with the cost and time impact shown, so the budget stays visible from the first day to handover.

We fit out cafés, restaurants, shops, showrooms, clinics and offices across Beirut, Mount Lebanon, Jbeil and Batroun.

Planning an opening?

Send us the floor plan and your target opening date, and we will come back with a programme and an itemised quotation. Call or WhatsApp +961 81 878 592, or email info@jadded.me.

 
 
 

Recent Posts

See All
Privacy Policy | سياسة الخصوصية

Jadded S.A.R.L. | Updated 11 October 2026 When you contact us or fill in a form on our website, Facebook, Instagram or WhatsApp, we collect your name, phone or WhatsApp number, email, and details abou

 
 

Comments


bottom of page